Downspout 01
The Downspout Is On The Parallel Face. The End Of The Extension Is On The Right Of The Photo.
Stair Upgrade 03
The Old Stairs Were Easily Removed. Most Of The Design Work Was Done w/ A Spray Can.
Stair Upgrade 15
Excess Concrete Was Used To Keep The Boards In Place. Notice The Conduit In The Form?
Stair Upgrade 17
They Dug Post Holes Into The Ground The Anchor The Steps And Prevent Them From Sliding Down The Hill.
